
Our projects and works in Chile
Structures featuring hybrid construction with reinforced concrete and CLT in warehouse buildings.
Modeling of 48,000 m2 in a highly seismic zone using RFEM 5 software (Dlubal) for warehouse buildings.




Basement: Hybrid structure. Up to the fourth floor: Reinforced Concrete (HA). From the fifth floor onwards: Cross-Laminated Timber (CLT) paneling.

